SCE-INT-NST-350975
Porterville · Tulare County · California · Commercial
System size
168.8 kW
152.9 kW AC
Installed
2024
2024-01-30
Price / watt
$0.29/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | PICKETT SOLAR CONSTRUCTION | All their sites → |
| Installer | PICKETT SOLAR CONSTRUCTION | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | CSI Solar | CS3W-450MB-AG | 300 | 450.5 W |
| inverter | SMA America | STP 62-US-41 (480V) [SI1] | 2 | — |
Site risk
Severe-weather exposure
Solar sites in Tulare County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (448 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-350975 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.