PGE-INT-125431938
Madera · Madera County · California · Commercial
System size
387.8 kW
378 kW AC
Installed
2024
2024-12-13
Price / watt
$2.67/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | PICKETT SOLAR CONSTRUCTION | All their sites → |
| Installer | PICKETT SOLAR CONSTRUCTION | All their sites → |
| Utility / operator | Southern California Edison Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | CSI Solar Co., Ltd. | CS6W-545MB-AG | 756 | 545.3 W |
| inverter | SMA America | STP 50-US-41 [480V] [SI1-SB] | 7 | — |
Site risk
Severe-weather exposure
Solar sites in Madera County have been matched to an average of 1.1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (487 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125431938 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.