Utility / plant operator
Terra-Gen Operating Co-Hybrid
8 recorded solar installations interconnected by Terra-Gen Operating Co-Hybrid — mostly in California.
At a glance
Terra-Gen Operating Co-Hybrid is a utility or plant operator with 8 recorded solar installations interconnected, totalling 639.2 MW (as reported), dated 2021 to 2025. All of its located records are in California.
Dataset updated . Sources: LBNL Tracking the Sun + permits + state programs + USGS/EIA utility-scale.
Growth
Installations by year
Latest records
Most recent recorded installs
| Date | Location | Size | $/W | Segment |
|---|---|---|---|---|
| Nov 1, 2025 | CA | 102,000 kW | — | UTILITY |
| Dec 1, 2022 | Mojave, CA | 71,300 kW | — | UTILITY |
| Jan 1, 2022 | Mojave, CA | 44,800 kW | — | UTILITY |
| Jan 1, 2022 | Mojave, CA | 41,200 kW | — | UTILITY |
| Jan 1, 2021 | Mojave, CA | 27,400 kW | — | UTILITY |
| Jan 1, 2021 | Mojave, CA | 48,600 kW | — | UTILITY |
| Jan 1, 2021 | Mojave, CA | 157,000 kW | — | UTILITY |
| Jan 1, 2021 | Mojave, CA | 146,900 kW | — | UTILITY |
Service geography
How does Terra-Gen Operating Co-Hybrid compare with other utilities & plant operators?
Its median system is 44,800 kW, about 6588 times the median of 6.8 kW for all recorded installations. Utilities & plant operators with similar recorded volume include Sacramento Municipal Util Dist (56,197), San Diego Gas & Electric Co. (52,118) and Potomac Electric Power Co (40,361).
How has Terra-Gen Operating Co-Hybrid's installation volume changed?
The earliest dated installation interconnected by Terra-Gen Operating Co-Hybrid is from 2021. The busiest year on record is 2021, with 4 installations. 2025 has 1 recorded installation. The most recent dated record is from Nov 1, 2025.
Where are Terra-Gen Operating Co-Hybrid's solar installations?
All of its located installations are in California. The places with the most records are Mojave, CA (7).
Frequently asked questions
How many solar installations has Terra-Gen Operating Co-Hybrid interconnected?
PanelCensus records 8 installations interconnected by Terra-Gen Operating Co-Hybrid, from Jan 1, 2021 to Nov 1, 2025, totalling 639.2 MW of capacity across 1 state. Coverage varies by state, so actual totals may be higher.
Where does Terra-Gen Operating Co-Hybrid operate?
Most recorded activity is in California (8).
How large are Terra-Gen Operating Co-Hybrid's solar installations?
The median recorded installation is 44,800 kW, against 6.8 kW for all recorded installations; total recorded capacity is 639.2 MW.
When was Terra-Gen Operating Co-Hybrid's most recent recorded solar installation?
The latest dated record is from Nov 1, 2025. Public registers report with a lag, so newer installations may not appear yet.
Why does Terra-Gen Operating Co-Hybrid appear on rooftop solar records?
On distributed (rooftop and commercial) records the operator field names the utility the system interconnects with; on utility-scale plants it names the plant operator. Terra-Gen Operating Co-Hybrid's profile counts both.
Related utilities & plant operators and places
- All utilities & plant operators· 191 profiles
- Solar in California· 8 interconnected by Terra-Gen Operating Co-Hybrid
- Sacramento Municipal Util Dist· 56,197 installations
- San Diego Gas & Electric Co.· 52,118 installations
- Potomac Electric Power Co· 40,361 installations
- Pacific Gas & Electric Co.· 31,251 installations
- Baltimore Gas & Electric Co· 27,272 installations
- CONSOLIDATED EDISON CO-NY INC· 26,655 installations
About this data
Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published October 29, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.
Cite as: PanelCensus, “Terra-Gen Operating Co-Hybrid, utility / plant operator”, https://panelcensus.com/operators/terra-gen-operating-co-hybrid-616 (data as of October 29, 2026).