Utility / operator
Geronimo Power
5 recorded solar installations interconnected by Geronimo Power — mostly in Texas.
Dataset updated . Sources: LBNL Tracking the Sun + permits + state programs + USGS/EIA utility-scale.
Installations interconnected
5
Total capacity
145.0 MW
DC nameplate
States
4
Median size
45,000 kW
Median $/W
—
pre-incentive
Third-party owned
0%
lease / PPA
Growth
Installations by year
2025
5
Latest records
Most recent recorded installs
| Date | Location | Size | $/W | Segment |
|---|---|---|---|---|
| Dec 1, 2025 | TX | 138,000 kW | — | UTILITY |
| Dec 1, 2025 | TX | 132,000 kW | — | UTILITY |
| Dec 1, 2025 | WI | 100,000 kW | — | UTILITY |
| Mar 1, 2025 | KY | 160,000 kW | — | UTILITY |
| Jan 1, 2025 | OH | 45,000 kW | — | UTILITY |
Frequently asked questions
How many solar installations has Geronimo Power interconnected?
PanelCensus records 5 installations interconnected by Geronimo Power, from Jan 1, 2025 to Dec 1, 2025, totalling 145.0 MW of capacity across 4 states. Coverage varies by state, so actual totals may be higher.
Where does Geronimo Power operate?
Most recorded activity is in Texas (2), Kentucky (1), Ohio (1).