Utility / plant operator
CVI CleanCapital Solar 1 LLC
11 recorded solar installations interconnected by CVI CleanCapital Solar 1 LLC — mostly in California.
At a glance
CVI CleanCapital Solar 1 LLC is a utility or plant operator with 11 recorded solar installations interconnected, totalling 28.8 MW (as reported), dated 2010 to 2015. Most of its records are in California (36%).
Dataset updated . Sources: LBNL Tracking the Sun + permits + state programs + USGS/EIA utility-scale.
Growth
Installations by year
Latest records
Most recent recorded installs
| Date | Location | Size | $/W | Segment |
|---|---|---|---|---|
| Jan 1, 2015 | Leicester, MA | 6,000 kW | $2.09/W | UTILITY |
| Jan 1, 2014 | Freehold, NJ | 6,300 kW | — | UTILITY |
| Jan 1, 2014 | Palmer, MA | 1,400 kW | — | UTILITY |
| Jan 1, 2014 | Palmer, MA | 1,400 kW | — | UTILITY |
| Jan 1, 2014 | Palmer, MA | 1,400 kW | $2.88/W | UTILITY |
| Jan 1, 2012 | Twentynine Palms, CA | 2,200 kW | $103.58/W | UTILITY |
| Jan 1, 2012 | Pownal, VT | 2,200 kW | — | UTILITY |
| Jan 1, 2012 | Palmdale, CA | 2,300 kW | $99.07/W | UTILITY |
| Jan 1, 2012 | Williamstown, VT | 2,500 kW | — | UTILITY |
| Jan 1, 2012 | Fresno, CA | 1,800 kW | — | UTILITY |
See all 11 installations →searchable & filterable; export to CSV with a free account
Service geography
How does CVI CleanCapital Solar 1 LLC compare with other utilities & plant operators?
Its median system is 2,200 kW, about 324 times the median of 6.8 kW for all recorded installations. Utilities & plant operators with similar recorded volume include Sacramento Municipal Util Dist (56,197), San Diego Gas & Electric Co. (52,118) and Potomac Electric Power Co (40,361).
How has CVI CleanCapital Solar 1 LLC's installation volume changed?
The earliest dated installation interconnected by CVI CleanCapital Solar 1 LLC is from 2010. The busiest year on record is 2012, with 5 installations. 2015 has 1 recorded installation. The most recent dated record is from Jan 1, 2015.
Where are CVI CleanCapital Solar 1 LLC's solar installations?
Its recorded installations span 4 states: California (4), Massachusetts (4), Vermont (2) and New Jersey (1). The places with the most records are Palmer, MA (3), Williamstown, VT (1), Freehold, NJ (1), Twentynine Palms, CA (1) and Fresno, CA (1).
Frequently asked questions
How many solar installations has CVI CleanCapital Solar 1 LLC interconnected?
PanelCensus records 11 installations interconnected by CVI CleanCapital Solar 1 LLC, from Jan 1, 2010 to Jan 1, 2015, totalling 28.8 MW of capacity across 4 states. Coverage varies by state, so actual totals may be higher.
Where does CVI CleanCapital Solar 1 LLC operate?
Most recorded activity is in California (4), Massachusetts (4) and Vermont (2).
How large are CVI CleanCapital Solar 1 LLC's solar installations?
The median recorded installation is 2,200 kW, against 6.8 kW for all recorded installations; total recorded capacity is 28.8 MW.
When was CVI CleanCapital Solar 1 LLC's most recent recorded solar installation?
The latest dated record is from Jan 1, 2015. Public registers report with a lag, so newer installations may not appear yet.
Why does CVI CleanCapital Solar 1 LLC appear on rooftop solar records?
On distributed (rooftop and commercial) records the operator field names the utility the system interconnects with; on utility-scale plants it names the plant operator. CVI CleanCapital Solar 1 LLC's profile counts both.
Related utilities & plant operators and places
- All utilities & plant operators· 191 profiles
- Solar in California· 4 interconnected by CVI CleanCapital Solar 1 LLC
- Solar in Massachusetts· 4 interconnected by CVI CleanCapital Solar 1 LLC
- Solar in Vermont· 2 interconnected by CVI CleanCapital Solar 1 LLC
- Sacramento Municipal Util Dist· 56,197 installations
- San Diego Gas & Electric Co.· 52,118 installations
- Potomac Electric Power Co· 40,361 installations
- Pacific Gas & Electric Co.· 31,251 installations
- Baltimore Gas & Electric Co· 27,272 installations
- CONSOLIDATED EDISON CO-NY INC· 26,655 installations
About this data
Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published October 19, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.
Cite as: PanelCensus, “CVI CleanCapital Solar 1 LLC, utility / plant operator”, https://panelcensus.com/operators/cvi-cleancapital-solar-1-llc-568 (data as of October 19, 2026).