PanelCensus

Amp Electric

Recently active

Solar installer based in New Mexico · active in 3 states · installer record #936 resolved from 29 public installation records.

At a glance

Amp Electric is a solar installer with 29 recorded installations totalling 1.1 MW, dated 2011 to 2024. Its records are concentrated in New Mexico (66%), where it ranks 58th of 150 profiled installers by volume and 4,510th of 10,536 nationally. The median installed price across 29 priced systems is $2.75/W before incentives.

Recorded installs
29
Total capacity
1.1 MW
DC nameplate
Median system
9.9 kW
≈ $28,625
Median price
$2.75/W
pre-incentive · 29 priced
Third-party owned
—
not reported in this state
Battery attach
0%
First recorded
2011
Last recorded
2024

Track record

Install volume by year

2011
1
2016
1$2.97/W
2017
2$3.26/W
2018
1$2.75/W
2020
6$2.27/W
2021
3$2.37/W
2022
8$2.69/W
2024
8$3.32/W

Bars: recorded installs · right column: this installer's median $/W that year.

Latest records

Most recent recorded installs

DateLocationSizePriceOwnership
Dec 27, 2024Orange, CA153.3 kW$373,954Host-owned
Oct 28, 2024Fresno, CA31.2 kW$115,000—
Oct 24, 2024Newport, RI51 kW$163,200—
Sep 19, 2024Nm, NM9.6 kW$33,600Host-owned
Jul 24, 2024Bristol, RI3 kW$10,415—
Jul 11, 2024Orange, CA615 kW$1,365,256Host-owned
Feb 23, 2024Albuquerque, NM11.2 kW$33,600Host-owned
Jan 11, 2024Albuquerque, NM6.4 kW$22,000Host-owned
Dec 28, 2022Albuquerque, NM16 kW$44,000Host-owned
Dec 20, 2022Albuquerque, NM7.1 kW$17,750Host-owned

See all 29 installations →searchable & filterable; export to CSV with a free account

Service geography

Busiest cities

Albuquerque, NM 14Lincoln, CA 3Orange, CA 2Fresno, CA 1Paso Robles, CA 1El Cajon, CA 1Los Ranchos, NM 1Oroville, CA 1

Record

Installer ID
PC-936
First recorded install
Jul 12, 2011
Last recorded install
Dec 27, 2024
Priced records
29

Is this your company?

Installers will be able to claim this profile, correct records and add licensing, NABCEP credentials and service details. Create a free account to be ready when claims open.

How does Amp Electric compare with other installers in New Mexico?

By recorded installations Amp Electric ranks 58th among the 150 installers based in New Mexico with five or more records. Its median price of $2.75/W is about 40% below the New Mexico median of $4.59/W (the installer's median covers every state it works in). Its median system, 9.9 kW, is about 71% above the state median of 5.8 kW. 0% include battery storage, compared with 2% of New Mexico records. Installers of similar recorded volume in New Mexico include Go Electric (32), ACH->CONSOLIDATED SOLAR TECH LLC - JERRY MOSHER/GILBERT MADRID (31) and SACRED POWER CORPORATION - ODES AMIJO CASTER (31).

How has Amp Electric's installation volume changed?

Amp Electric's earliest dated installation on record is from 2011. It has recorded installations in 8 calendar years. The busiest year was 2022, with 8 installations. 2024, its latest year with records, has 8. Its median price per watt moved from $2.97/W in 2016 to $3.32/W in 2024. The most recent recorded installation is dated Dec 27, 2024.

Where does Amp Electric install solar?

Recorded installations span 3 states: New Mexico (19, 66%), California (9, 31%) and Rhode Island (2, 7%). The cities with the most of its installations are Albuquerque, NM (14), Lincoln, CA (3), Orange, CA (2), Fresno, CA (1) and Paso Robles, CA (1).

Frequently asked questions

How many solar installations has Amp Electric completed?

PanelCensus records 29 installations by Amp Electric, from Jul 12, 2011 to Dec 27, 2024, totalling 1.1 MW of capacity. Public reporting varies by state, so the company's true total may be higher.

What does Amp Electric charge for solar?

The median installed price across 29 priced systems is $2.75/W before incentives (median system 9.9 kW, about $28,625). The New Mexico median is $4.59/W.

Where does Amp Electric install solar?

Recorded installs span 3 states, led by New Mexico (19), California (9) and Rhode Island (2). Its busiest city is Albuquerque, NM.

Is Amp Electric still installing solar?

The most recent installation attributed to Amp Electric in the public records is dated Dec 27, 2024; 2024 has 8 recorded installations. Records reach PanelCensus months to a couple of years after installation, so recent activity may not appear yet.

Does Amp Electric install battery storage?

0 recorded installations by Amp Electric (0%) include a battery.

Related installers and places

Dataset updated . Sources: LBNL Tracking the Sun + permit and program records; installer resolved by exact-normalized name matching.

About this data

Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published September 21, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.

Cite as: PanelCensus, “Amp Electric, solar installer (New Mexico)”, https://panelcensus.com/installers/new-mexico/amp-electric-936 (data as of September 21, 2026).