PanelCensus

Synergy 768

Recently active

synergy768.com ↗

Solar installer based in California · installer record #12739 resolved from 572 public installation records.

Data through: California through Aug 2026 (monthly state program data).

At a glance

Synergy 768 is a solar installer with 572 recorded installations totalling 3.8 MW, dated 2009 to 2026. All of its records are in California, where it ranks 411th of 6,163 profiled installers by volume and 680th of 10,840 nationally. Its median installed price for solar-only systems in 2023–2025 is $4.20/W before incentives, across 33 priced systems.

Recorded installs
572
Total capacity
3.8 MW
DC nameplate
Median system
6.6 kW
≈ $35,953
Median price
$4.20/W
2023–2025 · solar only · 33 priced
Third-party owned
7%
lease / PPA
Battery attach
25%
First recorded
2009
Last recorded
2026

Track record

Install volume by year

2009
62
2010
89
2011
10
2012
1
2016
35
2017
61
2018
12
2019
40
2020
14
2021
47
2022
122
2023
50
2024
9
2025
10
2026
10

Recorded installs per year; prices by year are in the table below.

Pricing

Price by year (solar only)

YearPriced systemsSynergy 768California medianvs state
20246$3.40/W$3.80/W−11%
202324$4.34/W$4.06/W+7%
202244$4.55/W$4.11/W+11%
202132$4.30/W$3.98/W+8%
20209$4.41/W$3.97/W+11%
201931$4.00/W$3.95/W+1%
201811$4.00/W$4.01/W−0%
201731$4.42/W$4.05/W+9%
201615$3.70/W$4.37/W−15%

Median installed price per DC watt before incentives, systems without a battery, by the year in the public record. Years with fewer than five priced systems are left out.

Why a company's own figure can differ from this one
  • Timing. These prices come from state incentive filings, published about once a year, so the latest full year here is 2025. Prices moved down in many states after 2023; a company's current quotes can be lower (or higher) than its last full year on record.
  • Dates. A filing is dated when the program processed it, not when the job was sold, so jobs can land in a different month or year than in the company's own books.
  • What the price includes. The filed price is the whole project as reported to the program, which can include loan dealer fees, electrical panel upgrades or roof work. A company's internal figure often leaves those out.
  • Batteries. Systems flagged with a battery are excluded here; a battery the filing didn't flag can still raise a year's median.

Equipment

Module, inverter and battery brands

EquipmentYearMain brands (share of systems that reported one)Year before
Modules2026*9 reportedSilfab 33% · SunPower 33% · Maxeon 22% · REC 11%Maxeon 25%2025, 8 reported
Inverters2026*10 reportedEnphase 60% · SunPower 20% · FranklinWH 10% · Tesla 10%Enphase 38%2025, 8 reported
Batteries2026*5 reportedTesla 80% · FranklinWH 20%—

Manufacturer on each recorded installation, as filed with the state program (Tracking the Sun for earlier years). Brand names are grouped by manufacturer family (e.g. Hanwha Q CELLS and Qcells North America count as Qcells). Not every state reports equipment, and battery brands come mainly from California and New Jersey. *2026 to date, from California records only.

Latest records

Most recent recorded installs

DateLocationSizePriceOwnership
Jul 27, 2026Tracy, CA6.6 kW—Host-owned · battery
May 8, 2026CA10.5 kW—Host-owned · battery
Apr 16, 2026Vacaville, CA16.8 kW—Host-owned
Mar 9, 2026Livermore, CA3.9 kW—Host-owned · battery
Mar 4, 2026Kensington, CA6.1 kW—Host-owned
Feb 26, 2026Bethel Island, CA6.6 kW—Host-owned
Feb 18, 2026Tracy, CA10.8 kW—Host-owned
Feb 17, 2026Discovery Bay, CA10.1 kW—Host-owned · battery
Jan 6, 2026Redwood City, CA4 kW—Host-owned
Jan 5, 2026Walnut Creek, CA7.2 kW—Host-owned · battery

See all 572 installations →searchable & filterable; export to CSV with a free account

Service geography

Busiest cities

Brentwood, CA 65Oakley, CA 27Antioch, CA 22Auburn, CA 19Loomis, CA 17Oakland, CA 15Vacaville, CA 13Stockton, CA 13

Record

Installer ID
PC-12739
First recorded install
Jan 16, 2009
Last recorded install
Jul 27, 2026
Priced records
422

Is this your company?

Owners can claim this profile free with a work email to keep the website and description current and post the company's own price figures beside ours.

If a record here isn't yours, a state is wrong, or a figure looks off, report a correction. We read every one and fix the record, usually within a few days.

How does Synergy 768 compare with other installers in California?

By recorded installations Synergy 768 ranks 411th among the 6,163 installers based in California with five or more records. Its 2023–2025 solar-only median of $4.20/W is roughly in line with the California median of $3.95/W on the same basis. Its median system, 6.6 kW, is about 11% above the state median of 5.9 kW. 7% of its recorded installations are third-party owned (lease or power-purchase agreement), against 29% across California. 25% include battery storage, compared with 16% of California records. Installers of similar recorded volume in California include Mcwire Electric (575), Brite Energy (574) and Perksolar (574).

How has Synergy 768's installation volume changed?

Synergy 768's earliest dated installation on record is from 2009. It has recorded installations in 14 calendar years. The busiest year was 2022, with 122 installations. 2025, its latest year with records, has 10. Its median price per watt moved from $6.55/W in 2009 to $4.67/W in 2025. The most recent recorded installation is dated Jul 27, 2026.

Where does Synergy 768 install solar?

All recorded installations are in California. The cities with the most of its installations are Brentwood, CA (65), Oakley, CA (27), Antioch, CA (22), Auburn, CA (19) and Loomis, CA (17).

Frequently asked questions

How many solar installations has Synergy 768 completed?

PanelCensus records 572 installations by Synergy 768, from Jan 16, 2009 to Jul 27, 2026, totalling 3.8 MW of capacity. Public reporting varies by state, so the company's true total may be higher.

What does Synergy 768 charge for solar?

For solar-only systems installed in 2023–2025, the median reported price is $4.20/W before incentives, across 33 priced systems. The California median on the same basis is $3.95/W. Across all 422 priced systems since 2009, including battery systems, the median is $5.63/W. Prices are the total project cost reported to state incentive programs, divided by the system's DC watts, so they can include electrical upgrades or other work billed with the solar.

Where does Synergy 768 install solar?

All 572 recorded installations are in California, the most of them in Brentwood.

Is Synergy 768 still installing solar?

The most recent installation attributed to Synergy 768 in the public records is dated Jul 27, 2026; 2025 has 10 recorded installations. Records here run California through Aug 2026 (monthly state program data), so the newest installations may not appear yet.

Does Synergy 768 install leased or PPA solar systems?

42 recorded installations by Synergy 768 (7%) are third-party owned — a lease or power-purchase agreement; across California the share is 29%.

Does Synergy 768 install battery storage?

144 recorded installations by Synergy 768 (25%) include a battery.

Related installers and places

Dataset updated . Sources: LBNL Tracking the Sun (through 2025), monthly state program records (California DGStats, NYSERDA, NJ Clean Energy, Illinois Shines) and permit records; installer resolved by exact-normalized name matching and, for state program records, by the systems both sources share.

About this data

Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published September 21, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.

Cite as: PanelCensus, “Synergy 768, solar installer (California)”, https://panelcensus.com/installers/california/synergy-768-12739 (data as of September 21, 2026).