PanelCensus

Mulick Construction And Design

Recently active

Solar installer based in California · installer record #8324 resolved from 38 public installation records.

Data through: California through Aug 2026 (monthly state program data).

At a glance

Mulick Construction And Design is a solar installer with 38 recorded installations totalling 265 kW, dated 2008 to 2026. All of its records are in California, where it ranks 2314th of 6,010 profiled installers by volume and 3,905th of 10,537 nationally. The median installed price across 25 priced systems from all years is $5.60/W before incentives.

Recorded installs
38
Total capacity
265 kW
DC nameplate
Median system
5.2 kW
≈ $35,614
Median price
$5.60/W
all years · 25 priced
Third-party owned
0%
lease / PPA
Battery attach
5%
First recorded
2008
Last recorded
2026

Track record

Install volume by year

2008
3
2009
7
2010
13
2011
2
2012
2
2013
2
2014
1
2015
1
2016
2
2017
1
2021
1
2023
1
2025
1
2026
1

Recorded installs per year.

Equipment

Module, inverter and battery brands

Latest records

Most recent recorded installs

DateLocationSizePriceOwnership
Feb 3, 2026Thousand Oaks, CA10 kW—Host-owned · battery
Jan 23, 2025Ventura, CA4.8 kW$32,552Host-owned · battery
Mar 9, 2023Oxnard, CA7.6 kW$28,900Host-owned
Mar 9, 2021Thousand Oaks, CA4.7 kW$17,750Host-owned
Feb 7, 2017Littlerock, CA8.4 kW$4,350Host-owned
May 19, 2016Agoura Hills, CA4.6 kW$17,000Host-owned
Mar 4, 2016Montebello, CA11.7 kW$40,000Host-owned
Sep 2, 2015Santa Paula, CA4.8 kW$21,398Host-owned
Jan 23, 2014Culver City, CA4.8 kW$19,810Host-owned
Jul 8, 2013Malibu, CA25.7 kW$133,136Host-owned

See all 38 installations →searchable & filterable; export to CSV with a free account

Service geography

Busiest cities

Los Angeles, CA 5Thousand Oaks, CA 5Van Nuys, CA 3Beverly Hills, CA 2West Hills, CA 2Malibu, CA 2Agoura Hills, CA 2

Record

Installer ID
PC-8324
First recorded install
Feb 27, 2008
Last recorded install
Feb 3, 2026
Priced records
25

Is this your company?

Owners can claim this profile free with a work email to keep the website and description current and post the company's own price figures beside ours.

If a record here isn't yours, a state is wrong, or a figure looks off, report a correction. We read every one and fix the record, usually within a few days.

How does Mulick Construction And Design compare with other installers in California?

By recorded installations Mulick Construction And Design ranks 2314th among the 6,010 installers based in California with five or more records. Its all-years median price of $5.60/W is about 31% above the California median of $4.26/W. Its median system, 5.2 kW, is about 12% below the state median of 5.9 kW. 0% of its recorded installations are third-party owned (lease or power-purchase agreement), against 29% across California. 5% include battery storage, compared with 16% of California records. Installers of similar recorded volume in California include Jw Electric (37), Maxi Builders (37) and Md Energy (37).

How has Mulick Construction And Design's installation volume changed?

Mulick Construction And Design's earliest dated installation on record is from 2008. It has recorded installations in 13 calendar years. The busiest year was 2010, with 13 installations. 2025, its latest year with records, has 1. Its median price per watt moved from $8.38/W in 2008 to $6.78/W in 2025. The most recent recorded installation is dated Feb 3, 2026.

Where does Mulick Construction And Design install solar?

All recorded installations are in California. The cities with the most of its installations are Los Angeles, CA (5), Thousand Oaks, CA (5), Van Nuys, CA (3), Beverly Hills, CA (2) and West Hills, CA (2).

Frequently asked questions

How many solar installations has Mulick Construction And Design completed?

PanelCensus records 38 installations by Mulick Construction And Design, from Feb 27, 2008 to Feb 3, 2026, totalling 265 kW of capacity. Public reporting varies by state, so the company's true total may be higher.

What does Mulick Construction And Design charge for solar?

The median installed price across 25 priced systems from all years is $5.60/W before incentives (median system 5.2 kW, about $35,614). The California median is $4.26/W. Prices are the total project cost reported to state programs, so they can include work billed with the solar.

Where does Mulick Construction And Design install solar?

All 38 recorded installations are in California, the most of them in Los Angeles.

Is Mulick Construction And Design still installing solar?

The most recent installation attributed to Mulick Construction And Design in the public records is dated Feb 3, 2026; 2025 has 1 recorded installation. Records here run California through Aug 2026 (monthly state program data), so the newest installations may not appear yet.

Does Mulick Construction And Design install leased or PPA solar systems?

0 recorded installations by Mulick Construction And Design (0%) are third-party owned — a lease or power-purchase agreement; across California the share is 29%.

Does Mulick Construction And Design install battery storage?

2 recorded installations by Mulick Construction And Design (5%) include a battery.

Related installers and places

Dataset updated . Sources: LBNL Tracking the Sun (through 2025), monthly state program records (California DGStats, NYSERDA, NJ Clean Energy, Illinois Shines) and permit records; installer resolved by exact-normalized name matching and, for state program records, by the systems both sources share.

About this data

Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published September 21, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.

Cite as: PanelCensus, “Mulick Construction And Design, solar installer (California)”, https://panelcensus.com/installers/california/mulick-construction-and-design-8324 (data as of September 21, 2026).