Living Green
Recently activeSolar installer based in California · installer record #7448 resolved from 74 public installation records.
Data through: California through Aug 2026 (monthly state program data).
At a glance
Living Green is a solar installer with 74 recorded installations totalling 635 kW, dated 2006 to 2026. All of its records are in California, where it ranks 1687th of 6,163 profiled installers by volume and 2,793rd of 10,840 nationally. Its median installed price for solar-only systems in 2023–2025 is $3.14/W before incentives, across 27 priced systems.
Track record
Install volume by year
Recorded installs per year; prices by year are in the table below.
Pricing
Price by year (solar only)
| Year | Priced systems | Living Green | California median | vs state |
|---|---|---|---|---|
| 2023 | 24 | $3.14/W | $4.06/W | −23% |
| 2022 | 13 | $3.40/W | $4.11/W | −17% |
| 2021 | 7 | $3.76/W | $3.98/W | −6% |
Median installed price per DC watt before incentives, systems without a battery, by the year in the public record. Years with fewer than five priced systems are left out.
Why a company's own figure can differ from this one
- Timing. These prices come from state incentive filings, published about once a year, so the latest full year here is 2025. Prices moved down in many states after 2023; a company's current quotes can be lower (or higher) than its last full year on record.
- Dates. A filing is dated when the program processed it, not when the job was sold, so jobs can land in a different month or year than in the company's own books.
- What the price includes. The filed price is the whole project as reported to the program, which can include loan dealer fees, electrical panel upgrades or roof work. A company's internal figure often leaves those out.
- Batteries. Systems flagged with a battery are excluded here; a battery the filing didn't flag can still raise a year's median.
Equipment
Module, inverter and battery brands
| Equipment | Year | Main brands (share of systems that reported one) | Year before |
|---|---|---|---|
| Modules | 20247 reported | Qcells 71% · Hyperion Solar 14% · LONGi 14% | — |
| Inverters | 20247 reported | Enphase 100% | — |
Manufacturer on each recorded installation, as filed with the state program (Tracking the Sun for earlier years). Brand names are grouped by manufacturer family (e.g. Hanwha Q CELLS and Qcells North America count as Qcells). Not every state reports equipment, and battery brands come mainly from California and New Jersey.
Latest records
Most recent recorded installs
| Date | Location | Size | Price | Ownership |
|---|---|---|---|---|
| Jul 2, 2026 | Santa Ana, CA | 13 kW | — | Host-owned · battery |
| Apr 14, 2026 | Mission Viejo, CA | 5.9 kW | — | Host-owned · battery |
| Mar 6, 2026 | Murrieta, CA | 8.8 kW | — | Host-owned |
| Jan 9, 2026 | Lake Forest, CA | 4.9 kW | — | Host-owned · battery |
| Dec 12, 2025 | Santa Ana, CA | 13.4 kW | $57,867 | Host-owned · battery |
| Oct 10, 2025 | Laguna Hills, CA | 14.6 kW | $58,752 | Host-owned · battery |
| Mar 10, 2025 | Laguna Beach, CA | 9.6 kW | $46,097 | Host-owned · battery |
| Dec 31, 2024 | Sierra Madre, CA | 13.1 kW | $49,067 | Host-owned · battery |
| Aug 28, 2024 | Dana Point, CA | 11.2 kW | $35,115 | Host-owned |
| Aug 12, 2024 | Newport Beach, CA | 4.1 kW | $52,055 | Host-owned · battery |
See all 74 installations →searchable & filterable; export to CSV with a free account
Service geography
Busiest cities
Record
- Installer ID
- PC-7448
- First recorded install
- Aug 31, 2006
- Last recorded install
- Jul 2, 2026
- Priced records
- 64
Is this your company?
Owners can claim this profile free with a work email to keep the website and description current and post the company's own price figures beside ours.
If a record here isn't yours, a state is wrong, or a figure looks off, report a correction. We read every one and fix the record, usually within a few days.
How does Living Green compare with other installers in California?
By recorded installations Living Green ranks 1687th among the 6,163 installers based in California with five or more records. Its 2023–2025 solar-only median of $3.14/W is about 21% below the California median of $3.95/W on the same basis. Its median system, 7.9 kW, is about 34% above the state median of 5.9 kW. 0% of its recorded installations are third-party owned (lease or power-purchase agreement), against 29% across California. 18% include battery storage, compared with 16% of California records. Installers of similar recorded volume in California include Acdc (74), Elios Solar (74) and Jt Solar Electric (74).
How has Living Green's installation volume changed?
Living Green's earliest dated installation on record is from 2006. It has recorded installations in 12 calendar years. The busiest year was 2023, with 27 installations. 2025, its latest year with records, has 3. Its median price per watt moved from $4.09/W in 2011 to $4.33/W in 2025. The most recent recorded installation is dated Jul 2, 2026.
Where does Living Green install solar?
All recorded installations are in California. The cities with the most of its installations are Dana Point, CA (10), San Clemente, CA (8), Lake Forest, CA (5), Capistrano Bch, CA (4) and Mission Viejo, CA (4).
Frequently asked questions
How many solar installations has Living Green completed?
PanelCensus records 74 installations by Living Green, from Aug 31, 2006 to Jul 2, 2026, totalling 635 kW of capacity. Public reporting varies by state, so the company's true total may be higher.
What does Living Green charge for solar?
For solar-only systems installed in 2023–2025, the median reported price is $3.14/W before incentives, across 27 priced systems. The California median on the same basis is $3.95/W. Across all 64 priced systems since 2006, including battery systems, the median is $3.47/W. Prices are the total project cost reported to state incentive programs, divided by the system's DC watts, so they can include electrical upgrades or other work billed with the solar.
Where does Living Green install solar?
All 74 recorded installations are in California, the most of them in Dana Point.
Is Living Green still installing solar?
The most recent installation attributed to Living Green in the public records is dated Jul 2, 2026; 2025 has 3 recorded installations. Records here run California through Aug 2026 (monthly state program data), so the newest installations may not appear yet.
Does Living Green install leased or PPA solar systems?
0 recorded installations by Living Green (0%) are third-party owned — a lease or power-purchase agreement; across California the share is 29%.
Does Living Green install battery storage?
13 recorded installations by Living Green (18%) include a battery.
Related installers and places
- All solar installers in California· 6,163 profiles
- Solar installations in California· 2,408,542 records
- Acdc· 74 installations
- Elios Solar· 74 installations
- Jt Solar Electric· 74 installations
- New Energy Construction· 74 installations
- Oc Solar Panels· 74 installations
- R T Maher Construction· 74 installations
Dataset updated . Sources: LBNL Tracking the Sun (through 2025), monthly state program records (California DGStats, NYSERDA, NJ Clean Energy, Illinois Shines) and permit records; installer resolved by exact-normalized name matching and, for state program records, by the systems both sources share.
About this data
Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published September 21, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.
Cite as: PanelCensus, “Living Green, solar installer (California)”, https://panelcensus.com/installers/california/living-green-7448 (data as of September 21, 2026).