Solar installer based in California · installer record #5283 resolved from 580 public installation records.

Data through: California through Aug 2026 (monthly state program data).

At a glance

Golden State Power is a solar installer with 580 recorded installations totalling 6.4 MW, dated 2003 to 2026. All of its records are in California, where it ranks 404th of 6,163 profiled installers by volume and 670th of 10,840 nationally. Its median installed price for solar-only systems in 2023–2025 is $3.65/W before incentives, across 18 priced systems.

Recorded installs
580
Total capacity
6.4 MW
DC nameplate
Median system
8 kW
≈ $32,000
Median price
$3.65/W
2023–2025 · solar only · 18 priced
Third-party owned
5%
lease / PPA
Battery attach
8%
First recorded
2003
Last recorded
2026

Track record

Install volume by year

2003
3
2004
8
2005
6
2006
7
2007
17
2008
8
2009
15
2010
7
2011
6
2012
3
2013
4
2014
2
2015
7
2016
30
2017
33
2018
127
2019
134
2020
76
2021
4
2022
15
2023
18
2024
2
2025
38
2026
9

Recorded installs per year; prices by year are in the table below.

Pricing

Price by year (solar only)

YearPriced systemsGolden State PowerCalifornia medianvs state
202318$3.65/W$4.06/W−10%
202215$5.95/W$4.11/W+45%
202070$3.52/W$3.97/W−11%
2019129$3.70/W$3.95/W−6%
2018127$4.00/W$4.01/W−0%
201733$4.00/W$4.05/W−1%
201630$3.87/W$4.37/W−11%

Median installed price per DC watt before incentives, systems without a battery, by the year in the public record. Years with fewer than five priced systems are left out.

Why a company's own figure can differ from this one
  • Timing. These prices come from state incentive filings, published about once a year, so the latest full year here is 2025. Prices moved down in many states after 2023; a company's current quotes can be lower (or higher) than its last full year on record.
  • Dates. A filing is dated when the program processed it, not when the job was sold, so jobs can land in a different month or year than in the company's own books.
  • What the price includes. The filed price is the whole project as reported to the program, which can include loan dealer fees, electrical panel upgrades or roof work. A company's internal figure often leaves those out.
  • Batteries. Systems flagged with a battery are excluded here; a battery the filing didn't flag can still raise a year's median.

Equipment

Module, inverter and battery brands

EquipmentYearMain brands (share of systems that reported one)Year before
Modules2026*8 reportedJA Solar 38% · AXITEC 13% · Canadian Solar 13% · Jinko Solar 13%Jinko Solar 41%2025, 29 reported
Inverters2026*8 reportedEnphase 75% · EG4 25%Enphase 80%2025, 25 reported
Batteries202527 reportedEnphase 93% · EG4 7%—

Manufacturer on each recorded installation, as filed with the state program (Tracking the Sun for earlier years). Brand names are grouped by manufacturer family (e.g. Hanwha Q CELLS and Qcells North America count as Qcells). Not every state reports equipment, and battery brands come mainly from California and New Jersey. *2026 to date, from California records only.

Latest records

Most recent recorded installs

DateLocationSizePriceOwnership
Jul 30, 2026Bakersfield, CA10.8 kW—Host-owned · battery
Jul 10, 2026Bakersfield, CA10.6 kW—Host-owned
Jun 2, 2026Visalia, CA8.2 kW—Host-owned · battery
Mar 13, 2026CA——Host-owned · battery
Feb 17, 2026Tehachapi, CA9.7 kW—Host-owned · battery
Feb 10, 2026Shafter, CA6.8 kW—Host-owned · battery
Jan 23, 2026Santa Paula, CA13.5 kW—Third-party · battery
Jan 8, 2026Carmichael, CA13 kW$25,000—
Jan 6, 2026Bakersfield, CA16.7 kW—Host-owned
Dec 9, 2025Bakersfield, CA8.9 kW$75,000Host-owned · battery

See all 580 installations →searchable & filterable; export to CSV with a free account

Service geography

Busiest cities

Bakersfield, CA 350Kingsburg, CA 31Fresno, CA 21Ridgecrest, CA 8Visalia, CA 7Shafter, CA 7Taft, CA 7

Record

Installer ID
PC-5283
First recorded install
Sep 26, 2003
Last recorded install
Jul 30, 2026
Priced records
536

Is this your company?

Owners can claim this profile free with a work email to keep the website and description current and post the company's own price figures beside ours.

If a record here isn't yours, a state is wrong, or a figure looks off, report a correction. We read every one and fix the record, usually within a few days.

How does Golden State Power compare with other installers in California?

By recorded installations Golden State Power ranks 404th among the 6,163 installers based in California with five or more records. Its 2023–2025 solar-only median of $3.65/W is roughly in line with the California median of $3.95/W on the same basis. Its median system, 8 kW, is about 35% above the state median of 5.9 kW. 5% of its recorded installations are third-party owned (lease or power-purchase agreement), against 29% across California. 8% include battery storage, compared with 16% of California records. Installers of similar recorded volume in California include Tenco Solar (585), Southern California Solar Energy (583) and Solar Shoppers (581).

How has Golden State Power's installation volume changed?

Golden State Power's earliest dated installation on record is from 2003. It has recorded installations in 23 calendar years. The busiest year was 2019, with 134 installations. 2025, its latest year with records, has 38. Its median price per watt moved from $7.48/W in 2003 to $5.73/W in 2025. The most recent recorded installation is dated Jul 30, 2026.

Where does Golden State Power install solar?

All recorded installations are in California. The cities with the most of its installations are Bakersfield, CA (350), Kingsburg, CA (31), Fresno, CA (21), Ridgecrest, CA (8) and Visalia, CA (7).

Frequently asked questions

How many solar installations has Golden State Power completed?

PanelCensus records 580 installations by Golden State Power, from Sep 26, 2003 to Jul 30, 2026, totalling 6.4 MW of capacity. Public reporting varies by state, so the company's true total may be higher.

What does Golden State Power charge for solar?

For solar-only systems installed in 2023–2025, the median reported price is $3.65/W before incentives, across 18 priced systems. The California median on the same basis is $3.95/W. Across all 536 priced systems since 2003, including battery systems, the median is $4.00/W. Prices are the total project cost reported to state incentive programs, divided by the system's DC watts, so they can include electrical upgrades or other work billed with the solar.

Where does Golden State Power install solar?

All 580 recorded installations are in California, the most of them in Bakersfield.

Is Golden State Power still installing solar?

The most recent installation attributed to Golden State Power in the public records is dated Jul 30, 2026; 2025 has 38 recorded installations. Records here run California through Aug 2026 (monthly state program data), so the newest installations may not appear yet.

Does Golden State Power install leased or PPA solar systems?

30 recorded installations by Golden State Power (5%) are third-party owned — a lease or power-purchase agreement; across California the share is 29%.

Does Golden State Power install battery storage?

48 recorded installations by Golden State Power (8%) include a battery.

Related installers and places

Dataset updated . Sources: LBNL Tracking the Sun (through 2025), monthly state program records (California DGStats, NYSERDA, NJ Clean Energy, Illinois Shines) and permit records; installer resolved by exact-normalized name matching and, for state program records, by the systems both sources share.

About this data

Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published September 21, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.