All Star Electric
Recently activeSolar installer based in Arizona · active in 3 states · installer record #654 resolved from 56 public installation records.
Data through: California through Aug 2026 (monthly state program data); its other 2 states through Dec 2025 (LBNL Tracking the Sun).
At a glance
All Star Electric is a solar installer with 56 recorded installations totalling 472 kW, dated 2009 to 2026. Its records are concentrated in Arizona (48%), where it ranks 242nd of 663 profiled installers by volume and 3,229th of 10,840 nationally. Its median installed price for solar-only systems in 2023–2025 is $2.31/W before incentives, across 10 priced systems.
Track record
Install volume by year
Recorded installs per year; prices by year are in the table below.
Pricing
Price by year (solar only)
| Year | Priced systems | All Star Electric | Arizona median | vs state |
|---|---|---|---|---|
| 2024 | 5 | $2.23/W | $3.73/W | −40% |
Median installed price per DC watt before incentives, systems without a battery, by the year in the public record. Years with fewer than five priced systems are left out.
Why a company's own figure can differ from this one
- Timing. These prices come from state incentive filings, published about once a year, so the latest full year here is 2025. Prices moved down in many states after 2023; a company's current quotes can be lower (or higher) than its last full year on record.
- Dates. A filing is dated when the program processed it, not when the job was sold, so jobs can land in a different month or year than in the company's own books.
- What the price includes. The filed price is the whole project as reported to the program, which can include loan dealer fees, electrical panel upgrades or roof work. A company's internal figure often leaves those out.
- Batteries. Systems flagged with a battery are excluded here; a battery the filing didn't flag can still raise a year's median.
Equipment
Module, inverter and battery brands
| Equipment | Year | Main brands (share of systems that reported one) | Year before |
|---|---|---|---|
| Modules | 2026*5 reported | Canadian Solar 40% · Mission Solar 20% · Qcells 20% · Shanghai PYTES Energy 20% | Canadian Solar 50%2025, 8 reported |
| Inverters | 2026*5 reported | Enphase 80% · Sol-Ark 20%Main brand changed from Sol-Ark (2025) | Sol-Ark 50%2025, 10 reported |
| Batteries | 20256 reported | Shanghai PYTES Energy 67% · EG4 33% | — |
Manufacturer on each recorded installation, as filed with the state program (Tracking the Sun for earlier years). Brand names are grouped by manufacturer family (e.g. Hanwha Q CELLS and Qcells North America count as Qcells). Not every state reports equipment, and battery brands come mainly from California and New Jersey. *2026 to date, from California records only.
Latest records
Most recent recorded installs
| Date | Location | Size | Price | Ownership |
|---|---|---|---|---|
| Jul 22, 2026 | Coarsegold, CA | — | — | Host-owned · battery |
| Apr 20, 2026 | Mariposa, CA | 3.9 kW | — | Host-owned |
| Feb 27, 2026 | Oakhurst, CA | 16.5 kW | — | Third-party · battery |
| Feb 12, 2026 | Oakhurst, CA | 11 kW | — | Host-owned · battery |
| Jan 9, 2026 | Ahwahnee, CA | 7.6 kW | — | Third-party · battery |
| Dec 30, 2025 | Clovis, CA | 5.3 kW | $0 | Third-party |
| Dec 29, 2025 | Catheys Valley, CA | 6.7 kW | $46,000 | Host-owned · battery |
| Dec 18, 2025 | Catheys Valley, CA | 11.6 kW | $46,000 | Host-owned · battery |
| Oct 20, 2025 | Coarsegold, CA | 15.7 kW | $64,000 | Host-owned |
| Oct 14, 2025 | El Portal, CA | 1.8 kW | $23,280 | Host-owned · battery |
See all 56 installations →searchable & filterable; export to CSV with a free account
Service geography
- Arizona
- 27
Busiest cities
Record
- Installer ID
- PC-654
- First recorded install
- Sep 1, 2009
- Last recorded install
- Jul 22, 2026
- Priced records
- 28
Is this your company?
Owners can claim this profile free with a work email to keep the website and description current and post the company's own price figures beside ours.
If a record here isn't yours, a state is wrong, or a figure looks off, report a correction. We read every one and fix the record, usually within a few days.
How does All Star Electric compare with other installers in Arizona?
By recorded installations All Star Electric ranks 242nd among the 663 installers based in Arizona with five or more records. Its 2023–2025 solar-only median of $2.31/W is about 42% below the Arizona median of $3.98/W on the same basis (the installer's median covers every state it works in). Its median system, 9.9 kW, is about 24% above the state median of 8 kW. 5% of its recorded installations are third-party owned (lease or power-purchase agreement), against 27% across Arizona. 21% include battery storage, compared with 7% of Arizona records. Installers of similar recorded volume in Arizona include Core Construction (59), Sunpower Electric (59) and Wise Electric (58).
How has All Star Electric's installation volume changed?
All Star Electric's earliest dated installation on record is from 2009. It has recorded installations in 14 calendar years. The busiest year was 2024, with 11 installations. 2025, its latest year with records, has 11. Its median price per watt moved from $8.02/W in 2009 to $4.58/W in 2025. The most recent recorded installation is dated Jul 22, 2026.
Where does All Star Electric install solar?
Recorded installations span 3 states: Arizona (27, 48%), California (22, 39%) and New Mexico (7, 13%). The cities with the most of its installations are Phoenix, AZ (13), Rio Rancho, NM (5), Goodyear, AZ (4), Coarsegold, CA (3) and Mariposa, CA (3).
Frequently asked questions
How many solar installations has All Star Electric completed?
PanelCensus records 56 installations by All Star Electric, from Sep 1, 2009 to Jul 22, 2026, totalling 472 kW of capacity. Public reporting varies by state, so the company's true total may be higher.
What does All Star Electric charge for solar?
For solar-only systems installed in 2023–2025, the median reported price is $2.31/W before incentives, across 10 priced systems. The Arizona median on the same basis is $3.98/W. Across all 28 priced systems since 2009, including battery systems, the median is $3.50/W. Prices are the total project cost reported to state incentive programs, divided by the system's DC watts, so they can include electrical upgrades or other work billed with the solar.
Where does All Star Electric install solar?
Recorded installs span 3 states, led by Arizona (27), California (22) and New Mexico (7). Its busiest city is Phoenix, AZ.
Is All Star Electric still installing solar?
The most recent installation attributed to All Star Electric in the public records is dated Jul 22, 2026; 2025 has 11 recorded installations. Records here run California through Aug 2026 (monthly state program data); its other 2 states through Dec 2025 (LBNL Tracking the Sun), so the newest installations may not appear yet.
Does All Star Electric install leased or PPA solar systems?
3 recorded installations by All Star Electric (5%) are third-party owned — a lease or power-purchase agreement; across Arizona the share is 27%.
Does All Star Electric install battery storage?
12 recorded installations by All Star Electric (21%) include a battery.
Related installers and places
- All solar installers in Arizona· 663 profiles
- Solar installations in Arizona· 370,725 records
- Core Construction· 59 installations
- Sunpower Electric· 59 installations
- Wise Electric· 58 installations
- Arizona Electric Lighting And Soundworks· 55 installations
- Sky Construction And Engineering· 55 installations
- American Way Solar· 54 installations
- Solar in California· 22 by All Star Electric
- Solar in New Mexico· 7 by All Star Electric
Dataset updated . Sources: LBNL Tracking the Sun (through 2025), monthly state program records (California DGStats, NYSERDA, NJ Clean Energy, Illinois Shines) and permit records; installer resolved by exact-normalized name matching and, for state program records, by the systems both sources share.
About this data
Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published September 21, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.
Cite as: PanelCensus, “All Star Electric, solar installer (Arizona)”, https://panelcensus.com/installers/arizona/all-star-electric-654 (data as of September 21, 2026).