PanelCensus

Solar installations in Winkler County, TX

3 recorded installations in Winkler County, Texas — capacity, prices and the installers doing the work.

Dataset updated . Sources: LBNL Tracking the Sun + city permit records + state programs + USGS/EIA utility-scale.

Limited data. Only 3 recorded installations in Winkler County so far, so the medians and penetration below are indicative, not reliable — a single new record can move them sharply.
Homes with solar
0.09%
of 3,209 homes
Installations
3
Total capacity
682 kW
Median price
$3.77/W
pre-incentive
Third-party owned
0%
lease / PPA

Severe-weather exposure: solar sites here have been matched to an average of 5.3 hail (2.2 severe) and 5 high-wind NOAA storm events — a regional inspection/maintenance signal (proximity, not confirmed damage).

Search every recorded installation in Winkler County by installer, size, date and equipment.

Search sites →

Most active

Top installers in Winkler County

#InstallerInstalls here
1Maverick Solar Enterprises1

Growth

Installations by year

YearNewCumulative% homes
2012
1
10.03%
2019
1
20.06%
2020
1
30.09%

Frequently asked questions

How many homes have solar in Winkler County?

PanelCensus records 3 solar installations in Winkler County, Texas (682 kW of capacity) — about 0.09% of the county's 3,209 housing units (U.S. Census ACS). Dataset coverage depends on Texas's reporting programs, so the true total is higher.

How much does solar cost in Winkler County?

The median installed price for recorded systems in Winkler County is $3.77/W pre-incentive; the median system runs 341.1 kW.

Who installs solar in Winkler County?

The most active recorded installers in Winkler County are Maverick Solar Enterprises.

County assignment is derived from installation ZIP codes via the Census 2020 ZCTA↔county crosswalk (primary county by land-area overlap) — approximate at county boundaries. Market penetration = recorded installations ÷ housing units (U.S. Census Bureau ACS 5-Year, Table B25001); it undercounts where dataset coverage is partial. See methodology.