Waco Solar
Mt Calm · Limestone County · Texas · Utility-scale
System size
400,000 kW
400,000 kW AC
Installed
2024
2024-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | NextEra Energy Inc [100%] | All their sites → |
| Developer | NextEra Energy Interconnection Holdings, LLC | All their sites → |
| Utility / operator | Waco Solar, LLC | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | — | — | 1 | — |
Site risk
Severe-weather exposure
Solar sites in Limestone County have been matched to an average of 4.1 hail and 2.7 high-wind NOAA storm events.
Regional storm exposure by proximity (7 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 31.7104, -96.8187 · map
Record uspvdb_405984 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need Texas solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.