PanelCensus

Broadway 2 - UC Riverside

Riverside · Riverside County · California · Utility-scale

System size
3,200 kW
3,000 kW AC
Installed
2014
2014-01-01
Price / watt
$4.00/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerIGS Valencia 2, LLCAll their sites →
InstallerEngie Services UsAll their sites →
Utility / operatorSouthern California Edison CoAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—

Site risk

Severe-weather exposure

Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.

Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 33.9703, -117.3310 · map

Record uspvdb_405638 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

Broadway 2 - UC Riverside — solar installation details | PanelCensus · PanelCensus