FPL Cypress Pond Solar
Vernon · Washington County · Florida · Utility-scale
System size
74,500 kW
74,500 kW AC
Installed
2023
2023-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Florida Power & Light Co [100%] | All their sites → |
| Developer | FPL | All their sites → |
| Utility / operator | Florida Power & Light Co | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | — | — | 1 | — |
Site risk
Severe-weather exposure
Solar sites in Washington County have been matched to an average of 1 hail and 2 high-wind NOAA storm events.
Regional storm exposure by proximity (7 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 30.5981, -85.8262 · map
Record uspvdb_404861 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.