PanelCensus

First City Solar Energy Center

McDavid · Escambia County · Florida · Utility-scale

System size
74,500 kW
74,500 kW AC
Installed
2023
2023-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerFlorida Power & Light Co [100%]All their sites →
Utility / operatorFlorida Power & Light CoAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—

Site risk

Severe-weather exposure

Solar sites in Escambia County have been matched to an average of 3.3 hail and 3.1 high-wind NOAA storm events.

Regional storm exposure by proximity (25 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 30.9171, -87.3413 · map

Record uspvdb_404834 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with Florida solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

First City Solar Energy Center — solar installation details | PanelCensus · PanelCensus