PanelCensus

Millersport GM 1

Amherst · Erie County · New York · Utility-scale

System size
5,000 kW
5,000 kW AC
Installed
2022
2022-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerGreenbacker Renewable Energy CorporationAll their sites →
Utility / operatorNiagara Mohawk Power Corp.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—

Site risk

Severe-weather exposure

Solar sites in Erie County have been matched to an average of 4.1 hail (0.6 severe) and 2.2 high-wind NOAA storm events.

Regional storm exposure by proximity (849 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 42.9933, -78.7906 · map

Record uspvdb_404816 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need New York solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

Millersport GM 1 — solar installation details | PanelCensus · PanelCensus