PanelCensus

ENGIE Solidago Solar Project - Hybrid

Townsend · New Castle County · Delaware · Utility-scale

System size
64,200 kW
50,000 kW AC
Installed
2023
2023-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerENGIE Solidago Solar LLCAll their sites →
DeveloperENGIE Solidago Solar LLCAll their sites →
Utility / operatorDelmarva PowerAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—

Site risk

Severe-weather exposure

Solar sites in New Castle County have been matched to an average of 3.6 hail and 4 high-wind NOAA storm events.

Regional storm exposure by proximity (43 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 39.3841, -75.7591 · map

Record uspvdb_404813 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need Delaware solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

ENGIE Solidago Solar Project - Hybrid — solar installation details | PanelCensus · PanelCensus