PanelCensus

Berrenda Mesa Water District

Lost Hills · Kern County · California · Utility-scale

System size
6,400 kW
6,400 kW AC
Installed
2022
2022-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerTesla Inc.All their sites →
InstallerCupertino Electric, Inc.All their sites →
Utility / operatorThe Greater Light USA LLCAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—

Site risk

Severe-weather exposure

Solar sites in Kern County have been matched to an average of 2.4 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (1,877 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 35.6927, -119.9897 · map

Record uspvdb_404780 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Berrenda Mesa Water District — solar installation details | PanelCensus · PanelCensus