PanelCensus

Hickory Park Solar Hybrid

Camilla · Mitchell County · Georgia · Utility-scale

System size
268,800 kW
195,500 kW AC
Installed
2015
2015-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerRWE Renewables Americas, LLCAll their sites →
Utility / operatorRWE Renewables Americas LLCAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—

Site risk

Severe-weather exposure

Solar sites in Mitchell County have been matched to an average of 3.4 hail and 1.6 high-wind NOAA storm events.

Regional storm exposure by proximity (34 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 31.3005, -84.1336 · map

Record uspvdb_404608 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need Georgia solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

Hickory Park Solar Hybrid — solar installation details | PanelCensus · PanelCensus