PanelCensus

DGS Valley State Prison

Chowchilla · Madera County · California · Utility-scale

System size
2,600 kW
2,300 kW AC
Installed
2021
2021-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerTerraVerde Energy LLCAll their sites →
Utility / operatorPacific Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—

Site risk

Severe-weather exposure

Solar sites in Madera County have been matched to an average of 1.1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (487 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 37.0880, -120.1510 · map

Record uspvdb_403903 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

DGS Valley State Prison — solar installation details | PanelCensus · PanelCensus