PanelCensus

East Line Solar

Coolidge · Pinal County · Arizona · Utility-scale

System size
121,400 kW
100,000 kW AC
Installed
2020
2020-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnersPower, LLCAll their sites →
Utility / operatorSalt River ProjectAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—

Site risk

Severe-weather exposure

Solar sites in Pinal County have been matched to an average of 3.7 hail (1 severe) and 4.1 high-wind NOAA storm events.

Regional storm exposure by proximity (91 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 32.8445, -111.5587 · map

Record uspvdb_403257 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with Arizona solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

East Line Solar — solar installation details | PanelCensus · PanelCensus