Snipesville
Denton · Jeff Davis County · Georgia · Utility-scale
System size
122,800 kW
86,000 kW AC
Installed
2020
2020-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | SR Snipesville, LLC | All their sites → |
| Utility / operator | Georgia Transmission Corp | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | — | — | 1 | — |
Site risk
Severe-weather exposure
Solar sites in Jeff Davis County have been matched to an average of 0 hail and 2.3 high-wind NOAA storm events.
Regional storm exposure by proximity (42 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 31.7050, -82.7387 · map
Record uspvdb_402867 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need Georgia solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.