PanelCensus

RE Maplewood

McCamey · Pecos County · Texas · Utility-scale

System size
327,000 kW
250,000 kW AC
Installed
2021
2021-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerOnward EnergyAll their sites →
DeveloperCENTURY GAS PROCESSING, LLCAll their sites →
Utility / operatorElectric Transmission Texas LLCAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—

Site risk

Severe-weather exposure

Solar sites in Pecos County have been matched to an average of 6.7 hail (6.5 severe) and 5.8 high-wind NOAA storm events.

Regional storm exposure by proximity (92 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 30.9797, -102.2480 · map

Record uspvdb_402290 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with Texas solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

RE Maplewood — solar installation details | PanelCensus · PanelCensus