PanelCensus

Castle Gap Solar Hybrid

McCarney · Upton County · Texas · Utility-scale

System size
234,000 kW
180,000 kW AC
Installed
2018
2018-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerUpton County Solar 2 LLCAll their sites →
DeveloperRoadrunner Solar Project, LLCAll their sites →
Plant operatorUpton County Solar 2 LLCAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—

Site risk

Severe-weather exposure

Solar sites in Upton County have been matched to an average of 4.6 hail (2.7 severe) and 2.4 high-wind NOAA storm events.

Regional storm exposure by proximity (21 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 31.2550, -102.2720 · map

Record uspvdb_401525 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with Texas solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Castle Gap Solar Hybrid — solar installation details