PanelCensus

Sun Harvest Solar NDP1

Dos Palos · Merced County · California · Utility-scale

System size
2,000 kW
1,500 kW AC
Installed
2015
2015-01-01
Price / watt
$1.25/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerTerraVerde Energy LLCAll their sites →
InstallerBarrier SolarAll their sites →
Utility / operatorPacific Gas & Electric CoAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—

Site risk

Severe-weather exposure

Solar sites in Merced County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (90 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 37.0578, -120.6490 · map

Record uspvdb_401242 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Sun Harvest Solar NDP1 — solar installation details | PanelCensus · PanelCensus