PanelCensus

OCI Alamo 7, LLC

Haskell · Haskell County · Texas · Utility-scale

System size
127,700 kW
106,400 kW AC
Installed
2016
2016-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerConsolidated Edison Development Inc.All their sites →
DeveloperDouble Mountain Fork LLCAll their sites →
Utility / operatorConsolidated EdisonAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—

Site risk

Severe-weather exposure

Solar sites in Haskell County have been matched to an average of 6.3 hail (1.4 severe) and 5.8 high-wind NOAA storm events.

Regional storm exposure by proximity (15 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 33.0400, -99.5525 · map

Record uspvdb_400968 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need Texas solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

OCI Alamo 7, LLC — solar installation details | PanelCensus · PanelCensus