Utah Red Hills Renewable Energy Park
Parowan · Iron County · Utah · Utility-scale
System size
104,800 kW
80,000 kW AC
Installed
2015
2015-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | MN8 Energy Operating Company LLC | All their sites → |
| Developer | Enterprise Solar, LLC | All their sites → |
| Utility / operator | PacifiCorp | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | — | — | 1 | — |
Site risk
Severe-weather exposure
Solar sites in Iron County have been matched to an average of 2.8 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (74 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 37.8828, -112.9042 · map
Record uspvdb_400669 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with Utah solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.