PanelCensus

SCE-INT-NST-234744

Cathedral City · Riverside County · California · Commercial

System size
52.7 kW
47.6 kW AC
Installed
2022
2022-07-11
Price / watt
$11.79/W
pre-incentive
Ownership
—
not reported

Parties

Who's involved

RoleName
DeveloperCALIFORNIA SOLAR INTEGRATORS INCAll their sites →
InstallerCALIFORNIA SOLAR INTEGRATORS INCAll their sites →
UtilitySan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
modulePhono Solar TechnologyPS450M4-24/TH50450 W
inverterSolarEdge TechnologiesSE43.2KUS (208V) [SI1]114.51 kW

Site risk

Severe-weather exposure

Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.

Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SCE-INT-NST-234744 from CADG · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

More solar data for this area

Working with California solar installation records? Pro adds alerts, change history and CSV export ($149/mo); Enterprise adds full national files, the API and an MCP server for AI tools.