Standard-Photovoltaic:8430/Menkar
San Diego · San Diego County · California · Commercial
System size
92 kW
Installed
2022
2022-09-14
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Sine Jeremy L&sarah S Revocable Living Trust 05-22 | All their sites → |
| Developer | KYRIELLE WILSON | All their sites → |
| Installer | KYRIELLE WILSON | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | — | — | 20 | — |
| module | — | — | 200 | — |
Site risk
Severe-weather exposure
Solar sites in San Diego County have been matched to an average of 2 hail and 3 high-wind NOAA storm events.
Regional storm exposure by proximity (80,199 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 32.9311, -117.1423 · map
Record sdcity_PMT-3176362 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.