PanelCensus

Photo-voltaic Residential Project:12531/Pomerado

San Diego · San Diego County · California · Commercial

System size
14 kW
Installed
2022
2022-05-12
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerChia Chih Yun&wong Hok HOAll their sites →
DeveloperSTELLAR SOLARAll their sites →
InstallerSTELLAR SOLARAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleHANWHAQ.PEAK DUO BLK ML-G10.a+ 40018399.6 W
module——14—
inverterSOLAREDGESE7600H-USS3 EH17.62 kW

Site risk

Severe-weather exposure

Solar sites in San Diego County have been matched to an average of 2 hail and 3 high-wind NOAA storm events.

Regional storm exposure by proximity (80,199 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 33.0222, -117.0601 · map

Record sdcity_PMT-3153866 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Photo-voltaic Residential Project:12531/Pomerado — solar installation details | PanelCensus · PanelCensus