PanelCensus

Photo-voltaic Residential Project:2164/Iris

San Diego · San Diego County · California · Commercial

System size
95 kW
Installed
2022
2022-01-27
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerMacalinao Justine AAll their sites →
DeveloperKYRIELLE WILSONAll their sites →
InstallerKYRIELLE WILSONAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——26—
module——200—

Site risk

Severe-weather exposure

Solar sites in San Diego County have been matched to an average of 2 hail and 3 high-wind NOAA storm events.

Regional storm exposure by proximity (80,199 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 32.5694, -117.0867 · map

Record sdcity_PMT-3135130 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

Photo-voltaic Residential Project:2164/Iris — solar installation details | PanelCensus · PanelCensus