PanelCensus

Project - Residential - Photovoltaic Pro Certify:4330/Newport

San Diego · San Diego County · California · Commercial

System size
12.5 kW
Installed
2019
2019-08-27
Price / watt
—
pre-incentive
Ownership
Host-owned
+ storage

Parties

Who's involved

RoleName
OwnerCoito Family Trust 04-29-15All their sites →
DeveloperEstephany ArreolaAll their sites →
InstallerEstephany ArreolaAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleAmpcircuit breaker in Tesla backup gateway. Change main circuit breker from 125 Amp to 200 Amp in new 200A distribution load center - Change main service200—

Site risk

Severe-weather exposure

Solar sites in San Diego County have been matched to an average of 2 hail and 3 high-wind NOAA storm events.

Regional storm exposure by proximity (80,199 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 32.7400, -117.2392 · map

Record sdcity_PMT-3046864 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Project - Residential - Photovoltaic Pro Certify:4330/Newport — solar installation details | PanelCensus · PanelCensus