0000709059
Buffalo · Erie County · New York · Commercial
System size
88 kW
Installed
2024
2024-05-23
Price / watt
$2.46/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Pilgrim Village Family Housing | All their sites → |
| Developer | Sustainable Energy Developments (DBA GreenSpark Solar) | All their sites → |
| Installer | Sustainable Energy Developments (DBA GreenSpark Solar) | All their sites → |
| Utility / operator | NIAGARA MOHAWK POWER CORP. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | JA Solar | JAM78S10-440/MR | 200 | 440.5 W |
| inverter | Chint Power Systems America | CPS SCA25KTL-DO/US-208 [208V] | 3 | 25 kW |
Site risk
Severe-weather exposure
Solar sites in Erie County have been matched to an average of 4.1 hail (0.6 severe) and 2.2 high-wind NOAA storm events.
Regional storm exposure by proximity (849 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 42.9029, -78.8628 · map
Record nysun_0000709059 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need New York solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.