0000650349
Fort Edward · Saratoga County · New York · Commercial
System size
32.4 kW
Installed
2024
2024-07-10
Price / watt
$3.35/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Kasselman Solar LLC | All their sites → |
| Installer | Kasselman Solar LLC | All their sites → |
| Utility / operator | NIAGARA MOHAWK POWER CORP. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q CELLS | Q.PEAK DUO BLK ML-G10 405 | 80 | 405 W |
| inverter | SolarEdge Technologies Ltd. | SE10000H-US [240V] | 3 | 9.99 kW |
Site risk
Severe-weather exposure
Solar sites in Saratoga County have been matched to an average of 8.4 hail and 3.1 high-wind NOAA storm events.
Regional storm exposure by proximity (467 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 43.2596, -73.6572 · map
Record nysun_0000650349 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need New York solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.