0000640074
Crompond · Westchester County · New York · Commercial
System size
348.7 kW
Installed
2025
2025-09-02
Price / watt
$3.87/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Normoyle, John | All their sites → |
| Developer | Ameresco, Inc. | All their sites → |
| Installer | Ameresco, Inc. | All their sites → |
| Utility / operator | CONSOLIDATED EDISON CO-NY INC | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q CELLS | Q.PEAK DUO XL-G10.3/BFG 485 | 719 | 484.7 W |
| inverter | SolarEdge Technologies Ltd. | SE50KUS [208V] | 6 | 16.56 kW |
Site risk
Severe-weather exposure
Solar sites in Westchester County have been matched to an average of 3 hail and 4.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,093 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 41.2971, -73.8691 · map
Record nysun_0000640074 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need New York solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.