0000478966
Binghamton · Broome County · New York · Utility-scale
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Tesla Inc. | All their sites → |
| Installer | EDPR NA Distributed Generation | All their sites → |
| Utility / operator | New York State Elec & Gas Corp | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Qcells North America | Q.PEAK DUO XL-G11.3/BFG 585 | 8,640 | 584.9 W |
| inverter | Chint Power Systems America | CPS SCH100KTL-DO/US-600 {600V} | 30 | 100 kW |
Site risk
Severe-weather exposure
Solar sites in Broome County have been matched to an average of 5 hail (3.1 severe) and 2.9 high-wind NOAA storm events.
Regional storm exposure by proximity (137 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 42.1202, -75.9389 · map
Record nysun_0000478966 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with New York solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.