0000251403
Hudson Falls · Washington County · New York · Utility-scale
System size
6,614.4 kW
Installed
2026
2026-01-21
Price / watt
$1.36/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | AES Clean Energy | All their sites → |
| Developer | AES Corporation | All their sites → |
| Installer | AES Distributed Energy, Inc. | All their sites → |
| Utility / operator | AES Clean Energy | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Jinko Solar Co., Ltd | JKM395M-72HL-V-Q | 8,268 | 800 W |
Site risk
Severe-weather exposure
Solar sites in Washington County have been matched to an average of 3.4 hail and 4.5 high-wind NOAA storm events.
Regional storm exposure by proximity (167 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 43.3600, -73.5630 · map
Record nysun_0000251403 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need New York solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.