0000224061
Cairo · Greene County · New York · Utility-scale
System size
3,013.5 kW
Installed
2023
2023-09-20
Price / watt
$1.42/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Nohmer, Frederick | All their sites → |
| Installer | Nexamp Inc | All their sites → |
| Utility / operator | CENTRAL HUDSON GAS & ELEC CORP | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | JA Solar | JAM72D10-405/MB | 7,462 | 405.2 W |
| inverter | Chint Power Systems America | CPS SCH125KTL-DO/US-600 [600V] | 16 | 125 kW |
Site risk
Severe-weather exposure
Solar sites in Greene County have been matched to an average of 1.3 hail and 2.6 high-wind NOAA storm events.
Regional storm exposure by proximity (126 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 42.3082, -74.0421 · map
Record nysun_0000224061 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need New York solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.