0000093432
Kingston · Ulster County · New York · Utility-scale
System size
6,004 kW
Installed
2022
2022-12-28
Price / watt
$2.06/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Tilcon Minerals Inc | All their sites → |
| Installer | Generate Capital | All their sites → |
| Utility / operator | CENTRAL HUDSON GAS & ELEC CORP | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | GCL System Integration Technology Co., Ltd. | GCL-M6/72GDF370 | 16,227 | 369.8 W |
| inverter | SMA America | SC 2500-EV-US [550V] | 2 | 2353.87 kW |
Site risk
Severe-weather exposure
Solar sites in Ulster County have been matched to an average of 4.5 hail and 2.7 high-wind NOAA storm events.
Regional storm exposure by proximity (498 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 41.9585, -73.9720 · map
Record nysun_0000093432 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need New York solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.