PanelCensus

GVP Phase 3

Grand Junction · Mesa County · Colorado · Community solar

System size
36.5 kW
28.1 kW AC
Installed
2017
2017-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperGRID AlternativesAll their sites →
Utility / operatorGrand Valley Power CooperativeAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Site risk

Severe-weather exposure

Solar sites in Mesa County have been matched to an average of 4.6 hail and 2.8 high-wind NOAA storm events.

Regional storm exposure by proximity (15 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record nrelcs_co_gvp_phase_3 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need Colorado solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

GVP Phase 3 — solar installation details | PanelCensus · PanelCensus