GVP Phase 2
Grand Junction · Mesa County · Colorado · Community solar
System size
71 kW
54.6 kW AC
Installed
2015
2015-01-01
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | GRID Alternatives | All their sites → |
| Utility / operator | Grand Valley Power Cooperative | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Site risk
Severe-weather exposure
Solar sites in Mesa County have been matched to an average of 4.6 hail and 2.8 high-wind NOAA storm events.
Regional storm exposure by proximity (15 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record nrelcs_co_gvp_phase_2 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need Colorado solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.