PanelCensus

MA-346

Palmer · Hampden County · Massachusetts · Utility-scale

System size
8,644.3 kW
Installed
2023
2023-12-29
Price / watt
$2.82/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
InstallerBlueWave Capital, LLCAll their sites →
Plant operatorMassachusetts Electric CoAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleHanwha SolarOne—1—
inverterSMA America—1—

Site risk

Severe-weather exposure

Solar sites in Hampden County have been matched to an average of 5 hail (1.7 severe) and 2.5 high-wind NOAA storm events.

Regional storm exposure by proximity (470 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 42.1746, -72.3111 · map

Record mapts_346 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with Massachusetts solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

MA-346 — solar installation details