PanelCensus

Funston Solar

Jones County · Texas · Utility-scale

System size
350,000 kW
350,000 kW AC
Installed
2026
2026-12-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerFunston Solar, LLCAll their sites →
DeveloperABEI ENERGY & INFRASTRUCTURE LLCAll their sites →
Utility / operatorFunston Solar, LLCAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Site risk

Severe-weather exposure

Solar sites in Jones County have been matched to an average of 6.2 hail (4.4 severe) and 4.8 high-wind NOAA storm events.

Regional storm exposure by proximity (10 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 32.7837, -99.7202 · map

Record eia860m_67359_4666 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Funston Solar — solar installation details | PanelCensus · PanelCensus