MRG Goody Solar Project Hybrid
Lamar County · Texas · Utility-scale
System size
170,800 kW
170,800 kW AC
Installed
2026
2026-02-01
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Nexus Renewable Power, LLC | All their sites → |
| Developer | Invenergy | All their sites → |
| Utility / operator | Nexus Renewable Power, LLC | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Site risk
Severe-weather exposure
Solar sites in Lamar County have been matched to an average of 2.3 hail (1.1 severe) and 3.4 high-wind NOAA storm events.
Regional storm exposure by proximity (63 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 33.6392, -95.6291 · map
Record eia860m_66390_GDYPV · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need Texas solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.