GCC Trident Solar Project
Three Forks · Gallatin County · Montana · Utility-scale
System size
2,500 kW
2,000 kW AC
Installed
2022
2022-12-01
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Adapture Renewables, Inc. | All their sites → |
| Utility / operator | GCC Trident LLC | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | — | — | 1 | — |
Location: 45.9373, -111.4637 · map
Record eia860_68260_GCC1 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.