Hollister Wastewater Facility
Hollister · San Benito County · California · Utility-scale
System size
1,200 kW
1,000 kW AC
Installed
2011
2011-11-01
Price / watt
$4.20/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Generate Capital, PBC | All their sites → |
| Installer | Climatec | All their sites → |
| Utility / operator | Perpetual Energy Systems | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | — | — | 1 | — |
Location: 36.8572, -121.4459 · map
Record eia860_68016_HOLWF · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.