Cedar Trail
Glen St Mary · Baker County · Florida · Utility-scale
System size
104,580 kW
74,500 kW AC
Installed
2024
2024-11-01
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Florida Power & Light Co [100%] | All their sites → |
| Developer | FPL | All their sites → |
| Utility / operator | Florida Power & Light Co | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | — | — | 1 | — |
Site risk
Severe-weather exposure
Solar sites in Baker County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (11 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 30.3391, -82.1929 · map
Record eia860_67672_1 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.