PanelCensus

Baldy Mesa 2_Silver Peak Hybrid

Adelanto · San Bernardino County · California · Utility-scale

System size
64,900 kW
50,000 kW AC
Installed
2024
2024-12-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnersPower, LLCAll their sites →
Utility / operatorAES Clean EnergyAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—

Site risk

Severe-weather exposure

Solar sites in San Bernardino County have been matched to an average of 4.6 hail and 6.2 high-wind NOAA storm events.

Regional storm exposure by proximity (2,271 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 34.6091, -117.4537 · map

Record eia860_66885_SPKPV · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

Baldy Mesa 2_Silver Peak Hybrid — solar installation details | PanelCensus · PanelCensus