Solar Photovoltaic Project #44
Perris · Riverside County · California · Utility-scale
System size
600 kW
500 kW AC
Installed
2015
2015-02-01
Price / watt
$1.13/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Los Angeles Department of Water and Power | All their sites → |
| Developer | Southern California Edison | All their sites → |
| Installer | Tesla Energy | All their sites → |
| Utility / operator | Southern California Edison Co | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | — | — | 1 | — |
Site risk
Severe-weather exposure
Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.
Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 33.8392, -117.2208 · map
Record eia860_57540_S44E · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.